FUEL SYSTEM, OTHER:STORAGE:TANK ASSEMBLY:PRESSURE RELIEF DEVICES
Aug 30, 1995
101 units potentially affected
The defect: SOME TEMPERATURE SENSITIVE TRIGGERS WERE NOT X-RAYED. THESE TRIGGERS COULD CONTAIN INTERNAL VOIDS THAT WOULD MAKE THE TRIGGERS SUSCEPTIBLE TO ADVANCED CREEP CAUSING FALSE ACTIVATION AND VENTING OF THE CNG.
The risk: VENTING OF THE CNG COULD RESULT IN A FIRE.
The remedy: NEOPLAN WILL REPLACE THE PRD WITH THE NEWER DESIGN "GENERATION 2.5" PRESSURE RELIEF DEVICE.
NEOPLAN USA CORP.View on NHTSA.gov